Construction Ireland Construction Directory
Time and date
CONSTRUCTION DIRECTORY

Cork Solar

Cork Solar Contact Details

Mobile
Click to view
Contact
Mark O'Donohoe
Email
Address
Main St.
Castlemartyr
County Cork
Ireland

About Cork Solar

Solar power for everyone

According to the Department of Agriculture, this a solar PV system size for a dairy farm of approx. 6kWp combined with a 4.5kWh of battery storage capacity.

Grant aid in this initial pilot phase will be to fund a 6kWp solar system.

Costs are based on the cost of installation of a 6kWp (up to 6000 watts per hour) solar system; this includes a battery which is necessary to capture the energy output, thereby making it economically viable.

At this maximum size, the grant provided at the 40% rate would be €6,200, and at 60% it would be €9,300.

Further information

With our head office in Cork and installers nationwide, we can monitor your daily usage before designing a suitable system for your farm or home.

On dairy farms, this may be a system that runs the chiller throughout the day or runs the milking parlour when you need the power.

We can base the cost over a period of time, paying the equivalent of the grant up front and paying monthly over a period.

... So your ESB costs don't change and no lum sum is required for the first few years, while you reep the benefits over the next 10 years.

Cork Solar Serves The Following Areas

Solar Energy PLCGC Renewables LTDPremier Electrical (N I) LtdMiller Wholesale LtdFernhill StoneCuchulainn WorkwearPipelife Ireland LtdEvex LimitedLoocube.ieSiteCrew LTD
Terms and Conditions
2024/11/21 09:31:37