Construction Ireland Construction Directory
Time and date
CONSTRUCTION DIRECTORY

Resikom Solutions

Resikom Solutions Contact Details

Telephone
Click to view
Mobile
Click to view
Contact
Steven Page
Email
Address
111 Delaware Crescent
Shoeburyness
Southend On Sea
County Essex
SS3 9PJ
England UK

About Resikom Solutions

Welcome to Resikom Limited - Room Integrity Testing


The use of gaseous fire extinguishing systems to provide protection for computer and plant rooms is all but essential, given the consequences of fire damage and downtime for such critical equipment. For a fire suppression system to work, the room must have sufficient integrity to retain an extinguishing concentration for a specified period after discharge.

Failure to do so and the fire reignites. As this is the predominant cause of failure, the British and International Standard (BS:ISO14520) requires that an enclosure integrity test (aka room integrity test, fan test, or pressure test) be conducted on system installation and thereafter at annual intervals.

Resikom Solutions ImageResikom Solutions ImageResikom Solutions Image


Our staff have been at the forefront of such testing for well over a decade both in the UK and Ireland, as well as elsewhere overseas.

The test was introduced as an environmentally friendly alternative to discharge testing following the phase out of halon extinguishant under the Montreal Protocol on ozone depletion. It is applicable to all sizes of enclosure and all extinguishing gases, including argonite, inergen, proinert, IG55, FM200, FE25, HFC 227ea, FE25, Novec 1230 and CO2.

Resikom Solutions ImageResikom Solutions Image


The testing is clean and non-disruptive, using a door mounted fan(s) to measure leakage flow. Work may continue as normal in the room during the test. An immediate result is obtained for the total room leakage and consequent extinguishant retention time.

If this is below that required by the Standard, a detailed inspection is carried out to identify all major leakages for remedial sealing. A formal report is issued detailing the results and any recommendations. This should be retained for regulatory authority/ insurers reference.

Requirements


As from January 2001, gaseous fire extinguishing systems have been controlled by International Standard No 14520. This covers all the extinguishing gases introduced to supersede halon (e.g. argonite, inergen, FM200). It was published following the European Union decision requiring halon systems to be decommissioned by the end of 2003. Under this Standard, it is a requirement that an enclosure integrity test is conducted both upon system installation and annually thereafter as part of the routine maintenance schedule. This is to ensure that an extinguishing concentration is held for a sufficient time to prevent reignition in the event of a fire.

References :-
  1. BS:ISO 14520 Gaseous Fire Extinguishing Systems (2000)
  2. EU Regulation 2037/2000 (26/6/00)
  3. BFPSA Code of Practice for Gaseous Fire Fighting Systems
  4. LPC Recommendations for Loss Prevention in EDP Installations
  5. NFPA 2001 Clean Agent Fire Extinguishing Systems (2000)

Click here to read our FAQs


Resikom Solutions Image

Resikom Solutions Serves The Following Areas

Premier Floor ScreedS & N GraniteKG ManufacturingSeamless AluminiumTurboChip Ireland LtdHoulihan ConstructionNW RenewablesConstruction Information ServicesPowerscreen Ireland LtdMW Hire Group
Terms and Conditions
2024/11/23 09:34:23